Harayamadai, Minami Ward, Sakai City: property prices and land values

原山台(南区)

Data last updated: November 2026 (Land Price Publication 2026, Prefectural Survey 2026, transactions through Q2 2026)

Avg. residential land price
No data
Avg. commercial land price
No data
1-year change
—
Residential — · commercial —
5 years / 10 years
+23.5% / +24.8%
Same sites, chained
Pre-owned condos per m²
¥221K/m²
70 m² ≈ ¥15.5M · 32 sales
Pre-owned houses (median)
¥23.5M
≈ $148K · 4 sales
Real Estate Zukan Index
No data
Total real estate value Estimate
Coming soon

Map official land price survey sites

Tap anywhere on the map to get an estimate for that spot. Map: GSI Tiles.

Harayamadai, Minami Ward, Sakai City compared with larger areas

AreaAvg. residential≈ USD/sq ftHarayamadai, Minami Ward, Sakai City is1 year5 yearsCondos per m²Index
Harayamadai, Minami Ward, Sakai City —— —+23.5% ¥221K/m²—
Minami Ward, Sakai City ¥99K/m²$58/sq ft +3.2%+7.8% ¥222K/m²76
Sakai City ¥154K/m²$90/sq ft +3.9%+15.4% ¥312K/m²—
Osaka ¥168K/m²$99/sq ft +4.1%+13.4% ¥462K/m²92
Japan ¥120K/m²$70/sq ft +2.1%+8.0% ¥493K/m²—

Official land price survey sites highest first · 1 sites

LocationUsePrice per m²≈ USD/sq ft1 yearStation
大阪府 堺市南区原山台1丁14番6
Land Price Publication 2026
Industrial¥126K/m²$74/sq ft +6.8%栂・美木多
750 m

Transaction prices MLIT Real Estate Information Library · last 2 years · 37 sales

Condos per m² (median)
¥221K/m²
Condo price (median)
¥17.0M
Land & building (median)
¥23.5M
Land per m² (median)
—

Sales in the loaded period: Pre-owned condo 50 · Land & building 10 · Land 3

DistrictPeriodTypePriceAreaBuiltPer m²
HarayamadaiQ2 2026Land & building (contract) ¥12.0M105 m²1975—
HarayamadaiQ2 2026Pre-owned condo (contract) ¥16.0M85 m²1979¥188K/m²
HarayamadaiQ1 2026Pre-owned condo (contract) ¥41.0M90 m²2005¥456K/m²
HarayamadaiQ1 2026Pre-owned condo (contract) ¥3.5M70 m²1979¥50K/m²
HarayamadaiQ1 2026Pre-owned condo (contract) ¥38.0M95 m²2005¥400K/m²
HarayamadaiQ1 2026Pre-owned condo ¥40.0M70 m²2020¥571K/m²
HarayamadaiQ1 2026Pre-owned condo ¥30.0M80 m²2005¥375K/m²
HarayamadaiQ4 2025Land & building (contract) ¥28.0M100 m²2005—
HarayamadaiQ4 2025Pre-owned condo (contract) ¥7.0M65 m²1975¥108K/m²
HarayamadaiQ4 2025Pre-owned condo (contract) ¥35.0M65 m²2020¥538K/m²
HarayamadaiQ4 2025Pre-owned condo (contract) ¥6.8M65 m²1979¥105K/m²
HarayamadaiQ4 2025Pre-owned condo (contract) ¥31.0M70 m²2024¥443K/m²
HarayamadaiQ4 2025Pre-owned condo (contract) ¥30.0M90 m²2001¥333K/m²
HarayamadaiQ4 2025Pre-owned condo ¥7.0M60 m²1975¥117K/m²
HarayamadaiQ4 2025Pre-owned condo ¥18.0M80 m²1979¥225K/m²
HarayamadaiQ4 2025Pre-owned condo ¥2.0M65 m²1974¥31K/m²
HarayamadaiQ4 2025Pre-owned condo ¥35.0M60 m²2020¥583K/m²
HarayamadaiQ3 2025Pre-owned condo (contract) ¥19.0M85 m²1979¥224K/m²
HarayamadaiQ3 2025Pre-owned condo (contract) ¥50.0M90 m²2020¥556K/m²
HarayamadaiQ3 2025Pre-owned condo (contract) ¥30.0M75 m²2005¥400K/m²

Nearby neighborhoods

FAQ

How much do pre-owned condos cost in Harayamadai, Minami Ward, Sakai City?

The median price of pre-owned condo transactions in the last two years is ¥220,855 per m², with a median price of ¥17.0 million (32 transactions, MLIT Real Estate Information Library).

What is the land price forecast for Harayamadai, Minami Ward, Sakai City?

The Fudosan Zukan model projects residential land prices to change by +1.5% a year, reaching about ¥145,626 per m² in 10 years (range ¥119,413–¥171,839). Forecasts are projections, not guarantees.

Land prices are official survey prices (Land Price Publication as of January 1, Prefectural Land Price Survey as of July 1); transactions are MLIT transaction and contract prices. Averages, changes, forecasts and the index are calculated by Fudosan Zukan. All prices in Japanese yen; dollar figures (≈) at ¥158.25 = $1 are for reference. Estimated prices and forecasts on this site are for reference only and do not guarantee actual sale prices or appraisal values. The estimate is not a licensed real estate appraisal; it is an "AI-estimated price" calculated from public land price and transaction statistics. Forecasts are projections, not guarantees.